The Challenge
- Cut and Fill Earthworks – 20,000m3
- Bulk Fill Treatment of placed material to achieve >5.0% CBR (50Mpa) – 15,000m3
- Capping and Subbase Replacement Stabilisation to achieve >30% CBR (150Mpa) – 22,000m2
Industrial Buildings
Ground stabilisation solution involving bulk fill modification and subbase stabilisation to improve material usability, enhance strength and support construction access.
This project involved bulk fill modification and subbase stabilisation to improve the engineering performance of site materials and enable their reuse within a commercial development scheme.
The works focused on reducing moisture content in unsuitable materials and stabilising soils using hydraulic binders, transforming them into a durable and load-bearing construction layer.
By improving existing materials rather than replacing them, the project achieved a more efficient, economical and sustainable earthworks solution while ensuring long-term performance.
Ground Stabilisation Projects
Speak to our team about ground stabilisation for roads, platforms, compounds and development sites.